Massive Mold job at a very large commercial building in Beaverton
This is the result a long term water leak issue from the basement concrete. We were called in by a Construction firm because there were concerns of mold. Little did we know that we would be dealing with a very serious mold problem. Stachybotrys which is very toxic. Because of the sevrity of the mold growth we made a deadline of 4 days. With crews working tirelessly we met our goal and even finished before we had planned to. The construction company was thrilled to hear this news. The sooner we got the done, the sooner they could begin rebuilding!